Metal Buildings

J & H Office Equipment

This building incorporated a pre-engineered metal building structural and roofing system with load bearing masonry and steel stud framing system to present a truly unique appearance.
learn more >

Fed-Ex Ground Expansion

This project was a 3-phase expansion to an existing building.
learn more >

Beartooth Electric Co-Op

4,000 square foot pre-engineered metal building with minor interior framing for an office and bathrooms.
learn more >

6 Robblees

This project was an owner furnished pre-engineered metal building. learn more >

Retail Centers 1&2

11,500 square feet VP pre-engineered metal buildings with exterior CMU block walls and EIFS fa├žade.
learn more >

Dawson Community College

This 58,000 square foot pre-engineered metal building included a 2,000 seat gymnasium, lobby with elevator, concessions and restrooms; performing arts center with 200 seat auditorium, state of the art sound and light system recording studio and practice rooms; also included classrooms and office area.
learn more >

Elder Grove

Billings, MT

Elder Grove included an 18,825 SF addition. The project included a 5,625 SF wood framed classroom and large metal building. The classroom addition housed 4 new classrooms. The 13,200 SF pre-engineered metal building includes the gymnasium, 2 locker rooms, concession area and lobby.

learn more >